• Home
  • Government
    • Board of Selectmen
    • Town Manager
    • Boards & Committees
    • Meeting Agendas & Minutes
    • Phone Directory
  • DEPARTMENTS
    • Assessing
    • Community Development
      • Building Department
      • Health Department
      • Planning
    • Engineering
    • Finance
      • Purchasing
    • Fire Department
      • Administration
      • Operations
      • Fire Prevention & Education
    • Human Services
    • Human Resources
    • Information Technology
    • Kelley Library
    • Police Department
      • Administration
      • Operations
      • Operations Support
      • Animal Control
    • Public Works
      • Cemetery
      • Fleet
      • Highway
      • Parks & Properties
      • Transfer Station
    • Utilities
    • Recreation
    • SCTV17
    • SGC23
    • Senior Services
    • Tax Collector
    • Town Clerk
  • RESOURCES
    • FAQ
    • Receive Email Updates
    • Calendar
    • Employment Opportunities
    • Bid Opportunities
    • Town Report
    • Town Warrant
    • Order Maps/Data
    • Chamber of Commerce
    • School District
    • Visitor Information
    • District Court
    • News & Announcements
  • Contact Us

Plumbing and Gas

 

PART TIME Inspectors' office hours are: 8:30-9:30AM & 4:00-5:00PM, Mondayand Wednesday; 8:30-9:30AM Friday

Samuel Zannini, Jr. is the Plumbing and Gas Inspector.  This position is now part time.  These permits will only be accepted, reviewed and issued during counter hours on the alloted days of work (see above).  Inspections will only be done according to the Inspectors part time hours.

A Plumbing permit is required for all new installations of plumbing and the replacement of any part of an existing plumbing system.

Plumbing installations are subject to compliance with all prescribed regulations under the Salem Building Code respecting plumbing. No part of an installation is to be enclosed without inspection and approval of the Plumbing Inspector. Twenty-four hours notice is required for inspection.

For inspections, please call 890-2020 at least 24 hours prior to the date of the inspection. Please provide your permit number, your name, location of the inspection and telephone number.

 

Application for permit

Each application for a permit, with the required fee, shall be filed with the code official on a form furnished for that purpose and shall contain a general description of the proposed work and its location. The application shall be signed by the owner or an authorized agent. The permit application shall indicate the proposed occupancy of all parts of the building and that portion of the site or lot, if any, not covered by the building or structure and shall contain such other information required by the code official.  Plumbing & Gas permits will only be accepted, reviewed and issued during the part time counter hours listed above. 

By whom application is made.

Application for a permit shall be made by the person or agent to install all or part of any plumbing system. The applicant shall meet all qualifications established by statute , or by rules promulgated by this code, or by ordinance, or by resolution. The full name and address of the applicant shall be stated in the application.

Required inspections and testing.

The code official, upon notification from the permit holder or the permit holder’s agent, shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or an agent of any violations that must be corrected. The holder of the permit shall be responsible for the scheduling of such inspections.

Underground inspection shall be made after trenches or ditches are excavated and bedded, piping installed, and before any backfill is in place.

Rough-in inspections shall be made after the roof, framing, fire-blocking, fire-stopping, draft-stopping and bracing is in place and all sanitary, storm and water distribution piping is roughed-in, and prior to the installation of wall or ceiling membranes.

 

Final inspection shall be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy.

49°
9°
°F | °C
Cloudy
Humidity: 93%
7 mph
Fri
Showers
44 | 61
6 | 16
Sat
PM Showers
51 | 65
10 | 18

Contact Building

BUILDING PERMIT FEES 2013

PLUMBING/GAS INSPECTOR - NOW PART TIME

Town Hall
33 Geremonty Drive
Salem NH 03079

Phone (603) 890-2020
Fax (603) 898-1223

Inspectors' office hours are:
8:30-9:30AM & 4:00-5:00PM, Monday-Friday

Frequently Asked Questions

Contact Us

 

Building

Building
Applications
Building and Structural
Codes and Regulation
Residential New Construction
Residential Renovations
Residential Decks
Residential Garages
Residential In-law / Accessory Apartments
Residential Sheds
Residential Pools
Commercial New Construction
Commercial Renovations
Diagrams and Examples
Electrical
Plumbing and Gas
Code Enforcement
Documents, Links, FAQs

Contact Info

Town Hall
(603) 890-2000
33 Geremonty Drive
Salem, NH 03079
Mon-Fri 8:30-5:00PM
 
Additional Town Offices
 
Employee Telephone and E-mail Addresses

Help Center

  • Quick Reference
  • Frequently Asked Questions
  • Where to Go & What to See
  • User Login
  • Site Map

Resources

  • Kelley Library
  • School District
  • SCTV17
  • SGC23
sign
Copyright © 2011 by Salem, New Hampshire | Web Design by Danconia Media
The Town of Salem does not accept solicitation e-mails.